Jobs

Admin view of the jobs table — read-only v1. Edits go via BUILDOUT_PLAN_*.md + re-running the loader.

44 jobs · 5 complete · 1 in progress · 2 blocked · 36 not started
Search
Status

Active client comms

2 jobs
COM-01Ongoing

Staleness brief lands (precondition for Monday emails to be useful)

NovaUnknown — separate brief
COM-02Ongoing

Monday email cadence v1 fires (link-only)

Atlas30 min weekly

AI Prompt Builder

1 job
P3-APB-01Phase 3

AI Prompt Builder build begins (per existing brief)

NovaScope first

Audit

1 job
P2-AUD-01Phase 2

First Monday SOP audit run (per the Always-Current System)

Kathryn15 min

BCE

1 job
P1-BCE-01Phase 1

BCE Stripe conversion check — 4-week first read on signups by tier + monthly vs annual mix

Finn (Atlas reads, Kathryn reviews)30 min after 4 weeks

Brand

2 jobs
BRD-01Ongoing

Verify AI portrait replacement (interim exception expired 2026-05-09)

Kathryn (final) · Architect (repo audit done 2026-05-19)10 min
BRD-02Ongoing

Update chdigitals-v2 CLAUDE.md persona (Tech Lead → Dev per NAMED_TEAM v1.1)

Atlas (per B-g cascade)5 min

Case study

2 jobs
CASE-01Ongoing

Add Emerald Golf Club to client showcase (logo + page)

Pixel (logo) + Dev (page)10 min
CASE-02Ongoing

Add CH Tools to client showcase (logo + page)

Pixel (logo) + Dev (page)2 hrs

CH Tools onboarding

4 jobs
P1-CHT-01Phase 1

CH Tools case study lock-in — have the conversation, frame as value exchange

Kathryn1 conversation
P1-CHT-02Phase 1

CH Tools — take "before" screenshots of current digital setup

Kathryn (or Pixel-supported)1 hr
P1-CHT-03Phase 1

CH Tools — document current digital setup in detail

Kathryn2 hrs
P3-CHT-01Phase 3

CH Tools case study page build — /work/ch-tools

Dev4 hrs

Content

4 jobs
P3-CON-01Phase 3

First "What's Changed This Week" blog post

Aria (Ruflo) → Kathryn read-aloud2 hrs
CON-01Ongoing

Build rolling 4-week content calendar

Aria2 hrs
CON-02Ongoing

First Ruflo run via SK-007 (CH Digitals Ruflo brief)

Aria → Atlas files → Kathryn approves1 hr
CON-03Ongoing

Phase 3 automation: Atlas reads calendar → assembles Ruflo brief → Atlas surfaces output

Nova (build)Scope first

Dashboard

2 jobs
P1-DSH-01Phase 1

Dashboard production-ready — Meta Pixel final wiring in client portal

Nova4 hrs
P1-DSH-02Phase 1

Dashboard production-ready — GA4 final wiring in client portal

Nova4 hrs

Email

3 jobs
P2-EML-01Phase 2

Klaviyo welcome sequence — design + write 5 emails (Day 0 SOP #004 → Day 14 soft call)

Aria (Ruflo) → Kathryn read-aloud4 hrs
P2-EML-02Phase 2

Klaviyo welcome sequence — wire to SOP #004 download trigger

Dev2 hrs
P2-EML-03Phase 2

Klaviyo — industry tagging configured

Dev1 hr

GBP

1 job
P2-GBP-01Phase 2

Google Business Profile setup proper

Kathryn1 hr

GSC

3 jobs
GSC-01Wave 1

Connect Google Search Console to chdigitals.com.au

Dev30 min
GSC-02Wave 1

Submit sitemap (/sitemap.xml)

Dev10 min
GSC-03Wave 1

Pull GSC baseline (30-day impressions / clicks / queries)

Dev → Kathryn20 min

Layer 1

1 job
L1-01Ongoing

Resolve mining industry slug (add to STRUCTURE.md §6 OR remove from /central-highlands cards)

Kathryn15 min decision

Pricing

1 job
P3-PRC-01Phase 3

Strategic pricing review session

Kathryn + Finn (Architect synthesises)2 hrs

SEO-A

5 jobs
W1-SEO-01Wave 1

Apply homepage meta title edit (src/app/layout.tsx:35)

Dev5 min
W1-SEO-02Wave 1

Apply homepage meta description edit (src/app/layout.tsx:38-39)

Dev5 min
W1-SEO-03Wave 1

Apply /central-highlands meta description edit (src/app/central-highlands/page.tsx:14-15)

Dev5 min
W1-SEO-04Wave 1

Write + voice-check + merge /central-highlands "Marketing automation" section (NEW section)

Dev (draft) → Kathryn (read-aloud) → Dev (merge)45 min
W1-SEO-05Wave 1

Commit chdigitals-v2 STRUCTURE.md §4.2 absorption to git (plus W1-SEO-01/02/03 file edits)

Dev10 min

SEO-B

4 jobs
W2-SEO-01Wave 2

Build /digital-marketing-emerald-qld/page.tsx per KEYWORD_BRIEF §5.1

Dev1-2 days
W2-SEO-02Wave 2

Voice check before merge

Kathryn (read-aloud)30 min
W2-SEO-03Wave 2

Merge + publish + add to sitemap

Dev30 min
W2-SEO-04Wave 2

Sibling-pages decision (after 60 days GSC data)

Kathryn1 hr review

Social

3 jobs
SOC-01Ongoing

Decision: scheduling tool (Buffer / Later / Meta Business Suite)

Kathryn1 hr research + decision
SOC-02Ongoing

Formalise Kai's social-posting workflow

Architect drafts → Kathryn approves2 hrs
SOC-03Ongoing

Visual production decision (Pixel + human photo/video)

Kathryn1 hr

SOP

2 jobs
P1-SOP-01Phase 1

SOP file rename (space-separated → underscore convention per Rule 14)

Atlas30 min
P3-SOP-12Phase 3

Publish SOP #012 (first new SOP from roadmap)

Aria (Ruflo) + Pixel (PDF) → Kathryn final check1 day

TSH lead flow

2 jobs
TSH-01Ongoing

SOP drip-feed to TSH members (positioning + conversion bait)

Aria (Ruflo)2 hrs setup
TSH-02Ongoing

Cross-brand link plumbing in nav / footer

Dev1 hr